Subject classification: Citizen, enterprise
Composition classification: Other relevant documents Date of issue: 2020-01-22
Issuing agencies: District Government Office writing Number: Guangfu run [2020] 7
name Said: Official Reply of the district government office on the scheme of transferring the right to the use of state-owned construction land in 2 plots such as DEC2020003 in Guangfeng District
shut key Words:

Official Reply of the district government office on the scheme of transferring the right to the use of state-owned construction land in 2 plots such as DEC2020003 in Guangfeng District

Source: District Government Office Browse: Publication time: 2020-01-22 11:45
Font size: [ large   in   Small ]


 


 

Shangrao Natural Resources Bureau Guangfeng branch:

Your newspaper " Guangfeng District, Shangrao DEC2020003 Number, etc. Two Scheme for transferring state-owned construction land use right online in Zong massif "I have received it. The study of the people's Government of the district agreed that you should organize the public selling according to the relevant regulations of the transfer plan.

 

 

 

Office of the people's Government of Guangfeng District, Shangrao

2020 year One month Twenty-one day

Guangfeng District, Shangrao DEC2020003 Number, etc. Two Zong block Online listing of the right to use state-owned construction land Transfer plan

 

through Conference study Decided to sell online in the Shangrao high tech Industrial Park, Xinjiang Industrial Park, Hufeng district. Of DEC2020003 Number massif Guangfeng Xinjiang open Xinjiang industrial park industry Two hundred and fifty-eight Land lot) and the Xia Feng Information Industrial Park located in Shangrao hi tech Industrial Park. DEC2020004 No. 2 plot (Shangrao hi tech Zone) Two hundred and eighty-four Land lot) The right to use state-owned construction land. The following plans are drawn up:

First, Basic conditions and planning requirements of land sold

Plot number

Land boundary and spatial scope

entry name

Land area ( A kind of )

Land use

Years of transfer (years)

Planning target requirements

Bond         (RMB)

Starting price    (RMB)

Plot ratio

Architecture

Limit height

(m)

Building density ( % )

Green space ratio % )

Building storey

DEC2020003

See the red line plan for details.

Electric light source production project

Eighteen thousand six hundred and sixty-six

Industrial land

Fifty

One ~ One point six

Less than Twenty-four

Forty ~ Sixty

Less than Twenty

Multi-storey

Eighty

Ten thousand yuan

One hundred and eighty-eight

Ten thousand yuan

DEC2020004

See the red line plan for details.

Production of optical fiber connector accessories

Thirteen thousand three hundred and thirty-three

Industrial land

Fifty

One ~ One point five

Less than Fifty

Forty ~ Sixty

Equal to or equal to Twenty

/

Sixty

Ten thousand yuan

One hundred and thirty-four

Ten thousand yuan

Note: DEC2020003 Total floor area of block No. Eighteen thousand six hundred and sixty-six ~ Twenty-nine thousand eight hundred and sixty-five point six zero (2)

DEC2020004 Total floor area of block No. Thirteen thousand three hundred and thirty-three ~ Nineteen thousand nine hundred and ninety-nine point five zero It is.

Two. Bidding qualifications and requirements

Natural persons, legal persons and other organizations within and outside People's Republic of China may participate in the selling activities except for other provisions of laws and regulations. Units or individuals who fail to pay land grant fees in Guangfeng District of Shangrao and have idle land without justified reasons are not allowed to take part in this bid. Bidder shall go through the application procedure in accordance with the notice.

Three, the way of selling

The state-owned construction land use right is sold online. No reserve price. The bidding method of increasing price determines the winner of the competition according to the principle of high price.

Four. The time of the selling activity.

The specific time should be based on the announcement of the parcel assignment.

Five, the relevant provisions of the transfer

One Bidders should fully accept the status quo of the subject matter, including facilities within the parcel.

Two The auction margin is remitted into the margin account randomly generated by the online trading system according to the time and manner specified in the notice, whichever is the time to arrive at the account. After the transaction is completed, the total amount of the land transfer is repaid. 20% As a deposit for the land grant contract.

Three , This time The right to use state-owned construction land Online transfer is implemented by the highest bidder qualification post examination system, that is to say, the bidders' online transaction system will submit the bid application according to the regulations and pay the bid security deposit. The system will automatically have the bid qualification of the default bid applicant, and the transferor will only qualify the competing candidates. If the qualification examination is not approved by the competing candidate, the result of the bid is invalid, and the transaction fee will not be refunded, and the land will be reorganized.

Four The sale is determined. Be selected After people compete Be selected People should end their online transactions. Three Within one working day, online printing will be submitted to the regional natural resources bureau's trading center for qualification examination, including the confirmation of the candidates, payment of transaction fees and other related information. After the audit is correct, it can be identified as the winner and signed the confirmation of the transaction, and the entrustment of another agent shall go through the entrusted agency procedure. Signing the confirmation of transaction. Ten Within a working day, the transaction confirmation letter signed by people must be signed on time to the natural resources bureau of the region to sign the contract for the assignment of the right to the use of state-owned construction land. Overdue signature Thirty Within days, according to the land transaction price. 20% Pay the penalty; overdue. Thirty If the above date is deemed to be a waiver of the subject matter, the result of the transaction is invalid and the paid deposit will not be returned.

Five In the red line of the planned land use, the actual delivery area is not in conformity with the transfer area, and shall be dealt with according to the relevant provisions of the natural resources department.

Six The opening and completion time of the plots: construction within one year after the delivery of the subject matter. , It will be completed in three years.

Seven The property management in the whole area is carried out according to the relevant regulations of the state.

Six. Time, place, and liability for breach of contract.

The winner must sign the contract for the assignment of the right to the use of state-owned construction land. Thirty The total transaction price will be paid within days.

One Land price remittance to bank: China Postal savings bank Shangrao Guangfeng District Branch Sales Department

Account opening unit: Finance Bureau of Guangfeng District, Shangrao

account        Number: One hundred thousand and eighty-five trillion and nine hundred and seventy-seven billion nine hundred and sixty million ten thousand and three

Two Bank of Jiangxi Guangfeng Rural Cooperative Bank Sales Department

Account opening unit: Finance Bureau of Guangfeng District, Shangrao

account        Number: One hundred and sixty-one thousand and thirty-nine trillion and one hundred and forty billion thirty-two thousand four hundred and twenty-three

Seven. The way and time of delivery of the subject matter.

Two months after land transaction price is cleared. The Jiangxi Shangrao high tech Industrial Park Management Committee shall transfer the subject matter to the assignee in accordance with the relevant regulations, and carry out the construction process with the transferee.

Eight. Land use requirements

One After the land auction is completed, the competitor must entrust the unit with the corresponding design qualification to compile the plan plan and the architectural design plan. The district government shall take charge of the leadership and organize the relevant departments to carry out joint trial.

Two After the land is contested, the land user shall apply to the District Natural Resources Bureau in writing when the project is started and completed. The regional natural resources bureau shall verify the contents of the contract.

Three The proposed construction project must have the environmental protection opinions issued by the environmental protection department and the "construction project record" issued by the NDRC or the Ministry of industry and commerce.

Four The competitors must strictly carry out project construction and use of land in accordance with the terms stipulated in the contract for the assignment of the right to the use of state-owned construction land. In the process of land use, we should consciously accept the supervision and management of relevant departments such as construction and natural resources. After the completion of the project, the acceptance by the departments of construction and natural resources is not acceptable. The competent departments shall order the rectification within a specified time and put forward the opinions on handling the breach of contract. If the time limit for rectification is still not qualified, the competing person shall bear the corresponding responsibility according to the agreement.

Five The transferee shall, on the date of obtaining the ratification of the construction land, organize and implement the relevant items stipulated in the contract for the assignment of the right to the use of the state-owned construction land.

Six Other requirements: the area of administrative office and life service facilities shall not exceed the total area of industrial projects. 7% It is strictly forbidden to build complete facilities, such as complete residence, expert building, guesthouse, guest house and training center within the scope of industrial project land.

Nine, taxes and fees

According to Guangfu character [2009]84 Document No. 1 is currently in force.

Ten. Construction and construction

According to the red line map of the planned land use, the "Notice of planning and design conditions" issued by the Guangfeng sub Bureau of Shangrao Natural Resources Bureau, and the project plan plan after the joint trial, the construction is carried out and subject to the supervision and management of the natural resources department.

Eleven, others

One The supervision and sales team is composed of the district government office, the District Commission for Discipline Inspection, the District People's Procuratorate, the District Natural Resources Bureau, the District Finance Bureau and other units.

Two After the land is contested, the land user shall declare in writing to the District Natural Resources Bureau when the project is started and completed. After receiving the declaration, the District Natural Resources Bureau will verify the contents of the contract.

Three The bidder shall be liable for compensation if the transaction result is not valid and the loss is caused by the illegal act of bribery, collusion or fraud.