Guangfeng District Xia Feng water plant emergency intake and repair facilities renovation project announcement

Source: Shangrao Guangfeng lyang water supply Co., Ltd. Browse: Publication time: 2020-06-18 08:48
Font size: [ large   in   Small ]


Jian Jian Guang Jian (2020) thirteenth

1. The emergency repair and reconstruction project of the water intake facilities in the Xia Feng water works in Guangfeng district has been approved by the GF (2020) Document No. 118, which is funded by the enterprise itself. The total investment of the project is about 4 million 830 thousand and 400 yuan (of which the equipment is about 2 million 200 thousand yuan). The emergency repair and reconstruction project of the water intake facility at Guangfeng Xia Feng water works is now open and simple. The announcement is as follows:

Two. Overview of the contract works:

1. Contracting unit: Shangrao Guangfeng District lyang water supply Co., Ltd.

2. Project name: emergency repair and reconstruction project of water intake facilities at Guangfeng Xia Feng water works.

3, project location: Shangrao Guangfeng district electronic information industry park;

4, construction scale: installation of process piping and muddy water pipe in water plant, transformation of water pumping station, dosing room, chlorination room, reaction sedimentation tank, siphon filter transformation, etc.

5, funds in place: basically in place.

6. Project investment: the tender control price of this project is 736872.95 yuan, and the offer price is 685291.21 yuan (exceeding or below is invalid quote).

Three, the scope of the contract (the contents of the contract):

Process piping and water and electricity installation in water plant, intake pump room, dosing room, reaction sedimentation tank and siphon filter.

Four. Qualifications of tenderers:

With the qualification issued by the construction administrative department, such as [municipal engineering and municipal engineering grade three] (above), and in the Guangfeng municipal government's investment contractor for municipal and municipal infrastructure small projects, the contractor can enter the bidding application of the project.

1. Warehousing notice, legal representative's certificate or entrustment agent's entrustment, and his / her identity card (entrusted agent shall hold a power of attorney and a staff member who establishes labor relations with the unit, and provide valid social security certification materials for the opening of the project 6 months prior to the month).

2. A copy of the certificate of enterprise qualification certificate is affixed with the official seal.

3. Copy of copy of business license of enterprise legal person with official seal or electronic certificate;

4. A copy of the production safety license is stamped with official seal or electronic certificate.

5, the project leader must be [registered two level construction division, municipal engineering] (above); provide registration certificate or electronic certificate; the project leader shall provide the labor contract for the above six months before the contract is issued, and the original certificate of social basic old-age insurance should be paid. It shall not be a staff member of a public servant or a unit outside his or her office.

6. The original certificate of the title of the technical person in charge shall provide the labor contract and the original proof of the social basic old-age insurance for the labor contract which has not yet been expired in the first six months before the contract is issued in the first month of the project.

7. The original certificate of key position personnel (eight staff).

8, bid evaluation method: Quotation commitment method;

9, the project does not accept the joint tender.

Note: 1. Any legal person or other organization or individual that may have an impact on the fairness of the public touch ball may not participate in the above activities.

2, at the same time provide copies of the above documents, copies should be added to the official seal of our unit. And check the original of the certificate.

Five. The project adopts a simple and open procedure. Please sign up according to the requirements of the contract.

Six. Project duration: 30 calendar days (specifically specified in the construction contract).

Planned commencement date: 06, 25 2020

Planned completion date: 07, 25, 2020

Seven, engineering guarantee:

1, the performance bond guarantee shall be implemented, the performance bond shall be 10% of the contract price, and submitted within 7 days after receiving the bid notice.

2, implement a bank guarantee letter, the bank guarantee is 10% of the contract price, and submit within 7 days after receiving the bid notice.

Eight, other requirements: this project is strictly prohibited from bidding. The legal representatives, agents and other personnel involved in the project are all on the job. All the materials must be authentic and effective. For example, after verification, they are forged once verified, reported to the administrative department to record bad records, and clear out the pre selection contractor's Library and deal with them according to law.

This project will be announced in the public resource trading network of Shangrao Guangfeng district and the Guangfeng government network. The interested enterprises can learn from the 06 month 18 2020 to 06 2020 22 before 16:30 (Beijing time).

Employer: Shangrao Guangfeng District, Lu Yang Water Supply Co., Ltd.

Legal representative: (signature or seal)

06, 17 2020

Contacts:

Contact number:

Issuing agency: Jiangxi Xing Yuan Construction Engineering Co., Ltd.

Legal representative: (signature or seal)

06, 17 2020

Agent contact: Ms Yang

Contact number: 13927321899

Supervision and management organization of contracting out units: Office of tendering and bidding for construction projects in Guangfeng District, Shangrao

Person in charge (signature or seal):

06, 17 2020

Detailed rules for the emergency repair and renovation of the water intake facilities at Guangfeng Xia Feng water works

First, the contract time: 2020, 06, 23, 15:30 p.m.

Two. Place of contract: Nine floor, public resource trading center, Guangfeng District, Shangrao.

1. The general situation of the project and the scope of the contract: installation of process piping and muddy water pipe in the waterworks, alteration of water intake pump room, dosing room, chlorination room, reaction sedimentation tank and siphon filter transformation.

2. The tenderers shall submit the sealed sealed bidding documents before the contract is issued, including the offer letter of commitment, the list and the undertaking letter of the project constructor, the technical director and the eight member, which are to be sent to the project.

3. Invite units attending the contract: Shangrao Guangfeng district construction project bidding office, tendering unit, etc.

4, the principle of scaling: first, the ranking person is the winning bidder.

Three. Qualification examination:

1. Warehousing notice, legal representative's certificate or entrustment agent's entrustment, and his / her identity card (entrusted agent shall hold a power of attorney and a staff member who establishes labor relations with the unit, and provide valid social security certification materials for the opening of the project 6 months prior to the month).

2. A copy of the certificate of enterprise qualification certificate is affixed with the official seal.

3. Copy of copy of business license of enterprise legal person with official seal or electronic certificate;

4. A copy of the production safety license is stamped with official seal or electronic certificate.

5, the project leader must be [registered two level construction division, municipal engineering] (above); (providing a registration certificate or electronic certificate; the project leader must provide the labor contract which has not been included in the contract for the first six months before the contract is issued in the first month of the project) and the original certificate of social basic old-age insurance.

6. The original certificate of the title of the technical person in charge shall provide the labor contract and the original proof of the social basic old-age insurance for the labor contract which has not yet been expired in the first six months before the contract is issued in the first month of the project.

7. The original certificate of key position personnel (eight staff).

Note: a copy of the official seal affixed with the above materials provided by the bidder at the time of the contract.

Four, tender evaluation:

1. The project is evaluated by quotation commitment method, and the offer price is 685291.21 yuan.

2. Check in and check the entry notice, the legal representative or his principal agent, and his identity card before the deadline. (the entrusted agent shall hold the power of attorney and establish the employee relationship with the unit, and provide the valid social security certification materials for the 6 months prior to the opening of the project.) If the bidder fails to sign in, he will automatically abstain from voting.

3. Sign in serial number is the random Yaohao for fifteen selected contractors.

4. The project owner randomly selects 15 alternative contractors by random Yaohao, which is examined by the project owner and the administrative supervision department for the qualification examination of the alternative contractors and the sealed bidding documents.

The qualification examination mainly checks the legal person certificate (or authorized agent's authorization letter), and the copy of the identity card and the business license, the official seal or electronic certificate, the copy of the certificate of enterprise qualification certificate, the official seal, the copy of the production safety license, the official seal or the electronic certificate. It is necessary to express the official website of the official website for inspection), to register the construction registration certificate or electronic certificate (contract and social security original), the person in charge of Technology (contract and social security original), and the original certificate of the personnel concerned.

The bidders' bidding documents will be opened at the scene, all the Contractor's commitment price will be announced, the bid price in response to the offer price is valid, and the bid documents will be returned if the unanswered tender offer is invalid. The list and undertaking of the eight party members of the construction project division, the technical director and the letter of commitment are not provided by the bidder, and the tender documents are returned.

The on-site inspection fails to submit the qualification examination and invalidation bid undertaking in accordance with the regulations. The owner unit shall automatically abandon the bid processing according to the bidder, return the bid documents, and then make a random selection of 15 alternative contractors from the on-site registration units, and re examine the qualification examination and the examination of the bid documents, and so on, announce the list of the pre selected contractors and the withdrawal of other tendering units.

When the registration unit is under 15 (including 15), all the registration units will be selected as the list of alternative contractors. The project owners and the administrative supervision departments will examine the bidding documents of the alternative contractors and sealed and sealed documents. When the tendering units are less than 3, the project owners will be invited to fill 3 or more from the pre selected project library as alternative contractors. The contract time will be further announced.

5. A random number of the selected contractors who have been checked and checked will be randomly numbered. The owners will randomly select 1 selected contractors. The number of units selected for the first time will be the first candidate. The first one is the selected contractor and the result will be announced on the spot.

The way of extraction is machine bugle, which is determined by the owner at random at the contract site.

Five, other notes:

1, according to the regulations of Guangfu Office [2014] 167, the bidder should submit the salary guarantee for migrant workers after winning the bid.

2. After the announcement of the winning bid, the tenderee will organize the relevant personnel to verify the labor contract and social endowment insurance of the construction engineers and project technical leaders who are going to be awarded by the winning bidder.

3, the terms of the contract agreement will be signed by the employer and the candidate in consultation with the specific circumstances of the project.

4. The bid price of the candidate is the median price. The median price is the contract price. No party may change the price arbitrarily. The price adjustment within the permitted scope is specifically specified in the terms of the contract agreement by both Party A and Party B in accordance with the law. The project cost list is published in the Guangfeng public resources trading network (resource download column).

Issuing agency: Jiangxi Xing Yuan Construction Engineering Co., Ltd.

Legal representative: (signature or seal)

Contracting unit: Shangrao Guangfeng District lyang water supply Co., Ltd.

Legal representative: (signature or seal)

Supervision and management organization of contracting out units: Office of tendering and bidding for construction projects in Guangfeng District, Shangrao

Person in charge (signature or seal)

06 17 2020